In 2015, the Randolph County Commission tasked JMR+H with a Needs Assessment and Feasibility Study to provide an outlook 25+ year needs for a New County Jail. This study included Projected Inmate Bed Counts, Staffing Analysis for the new Jail Design, Yearly Operations Budget Estimate, Projected Cost Estimate of New Facility, and Elevation Model Case Studies. This new 27,181 GSF facility housing 110 inmates at initial occupancy with a maximum occupancy of 156 based on JMR+H’s long-term growth projections. A site design package was delivered early 2018 and is currently under construction. The total cost with the module package was $11,705,000.
In 2015, the Randolph County Commission tasked JMR+H with a Needs Assessment and Feasibility Study to provide an outlook 25+ year needs for a New County Jail. This study included Projected Inmate Bed Counts, Staffing Analysis for the new Jail Design, Yearly Operations Budget Estimate, Projected Cost Estimate of New Facility, and Elevation Model Case Studies. This new 27,181 GSF facility housing 110 inmates at initial occupancy with a maximum occupancy of 156 based on JMR+H’s long-term growth projections. A site design package was delivered early 2018 and is currently under construction. The total cost with the module package was $11,705,000.