• Leadership
    • Face-to-Face
    • Completed Work
    • Under Construction
    • In Design
  • Services
    • Contact Us
    • Links
    • Opportunities
    • Community Involvement
Menu

JMR+H Architecture, PC

445 Dexter Ave #5050
Montgomery AL, 36104
334.420.5672

Your Custom Text Here

JMR+H Architecture, PC

  • People
    • Leadership
    • Face-to-Face
  • Work
    • Completed Work
    • Under Construction
    • In Design
  • Services
  • Connect
    • Contact Us
    • Links
    • Opportunities
    • Community Involvement
BhamPhIBuilding2.jpg

Birmingham Armed Forces Reserve Center (AFRC)

BIRMINGHAM, ALABAMA

Cost: $36.4 M
Size: Approx. 201,107 SF
Green Certifications: LEED Gold

Phase I Building #1
The First Level (57,480 SF ): Assembly (Drill) Halls, Distance Learning Center, Simulation Center, Supply Rooms, Locker Rooms, Classrooms, Kitchen, Maintenance Training Facility, etc. The Second Level (42,895 SF): Office / Administrative Areas and The Medical Detachment Unit.

Phase I Building #2
The First Level (26,477 SF): Unit Storage Rooms, Supply Rooms, Locker Rooms, Classroom Space, etc. The Second Level (22,255 SF): Office / Administrative Areas.

Phase II Building #1
This new AFRC is 45,461 SF and includes two major components – a Special Forces Equipment Pool Facility and Readiness Center functions to house two Special Forces Units – Support Company 20th SFG and The Chemical (CML) Detachment.  The Special Forces Equipment Pool Facility includes areas designated for maintaining Special Forces Airborne and Waterborne Operations equipment and supplies, including an SF Parachute Drying / Storage Tower, including POV & Military Parking.

Birmingham Armed Forces Reserve Center (AFRC)

BIRMINGHAM, ALABAMA

Cost: $36.4 M
Size: Approx. 201,107 SF
Green Certifications: LEED Gold

Phase I Building #1
The First Level (57,480 SF ): Assembly (Drill) Halls, Distance Learning Center, Simulation Center, Supply Rooms, Locker Rooms, Classrooms, Kitchen, Maintenance Training Facility, etc. The Second Level (42,895 SF): Office / Administrative Areas and The Medical Detachment Unit.

Phase I Building #2
The First Level (26,477 SF): Unit Storage Rooms, Supply Rooms, Locker Rooms, Classroom Space, etc. The Second Level (22,255 SF): Office / Administrative Areas.

Phase II Building #1
This new AFRC is 45,461 SF and includes two major components – a Special Forces Equipment Pool Facility and Readiness Center functions to house two Special Forces Units – Support Company 20th SFG and The Chemical (CML) Detachment.  The Special Forces Equipment Pool Facility includes areas designated for maintaining Special Forces Airborne and Waterborne Operations equipment and supplies, including an SF Parachute Drying / Storage Tower, including POV & Military Parking.